Commercial Solar & Battery
Bascon was contracted to design and install a solar power system for the Caringamite Shires Timboon Sports Centre.
The BASCON team delivered the supply and installation of a solar power system to effectively manage and optimise the power usage for the councils Timboon sports centres.
This created a 28kWh battery capacity for a total 30kW solar generation solar capacity.
Services provideD
Project Management
Solar Power Design
Solar Power Installation
Solar Generation Optimisation
Project DELIVERY
Preparation Pre-Solar Install
Cable Tray is installed to allow for the power supply cables to run
Cable Tray Lid is then installed to protect the cables against any possible mechanical damage.
Cables are then run through the cable tray & fed back into the switchboard
The Solar Inverter is installed and wired ready for the connection of the Solar system
Installation Of Solar Panels
Before the Solar Panels are installed supporting system was engineered and then installed to provide support as well as sturdiness, especially during high winds on high-rise building
The Solar Panels are then installed to the supporting mounting system in place
The final wiring to the Solar Panels are completed by our qualified electricians / Clean Energy Council (CEC) accredited solar installers
Once the Solar panels are installed and wired, the inverter is then connected to the Solar array to produce electricity.
Installation Of Batteries
Battery concrete pads were formed and anti vandal cages were manufactured to fit.
Batteries are mounted on thew newly formed pads and connected to the system.
System is commissioned and monitored