CARINGAMITE SHIRE

TIMBOON SPORTS CENTRE

SOLAR & BATTERY INSTALLATION

Commercial Solar & Battery

Bascon was contracted to design and install a solar power system for the Caringamite Shires Timboon Sports Centre.

The BASCON team delivered the supply and installation of a solar power system to effectively manage and optimise the power usage for the councils Timboon sports centres.

This created a 28kWh battery capacity for a total 30kW solar generation solar capacity.

Services provideD

  • Project Management

  • Solar Power Design

  • Solar Power Installation

  • Solar Generation Optimisation

Project DELIVERY

Preparation Pre-Solar Install​

  • Cable Tray is installed to allow for the power supply cables to run​

  • Cable Tray Lid is then installed to protect the cables against any possible mechanical damage.​

  • Cables are then run through the cable tray & fed back into the switchboard​

  • The Solar Inverter is installed and wired ready for the connection of the Solar system​

Installation Of Solar Panels​

  • Before the Solar Panels are installed supporting system was engineered and then installed to provide support as well as sturdiness, especially during high winds on high-rise building​

  • The Solar Panels are then installed to the supporting mounting system in place​

  • The final wiring to the Solar Panels are completed by our qualified electricians / Clean Energy Council (CEC) accredited solar installers ​

  • Once the Solar panels are installed and wired, the inverter is then connected to the Solar array to produce electricity.​

Installation Of Batteries

  • Battery concrete pads were formed and anti vandal cages were manufactured to fit.

  • Batteries are mounted on thew newly formed pads and connected to the system.

  • System is commissioned and monitored